4 Beds
4 Baths
4,058 SqFt
4 Beds
4 Baths
4,058 SqFt
Key Details
Property Type Single Family Home
Sub Type Single Family Residence
Listing Status Active
Purchase Type For Sale
Square Footage 4,058 sqft
Price per Sqft $242
MLS Listing ID 1286438
Style Traditional
Bedrooms 4
Full Baths 3
Half Baths 1
Year Built 2004
Lot Size 8.760 Acres
Acres 8.76
Property Sub-Type Single Family Residence
Source East Tennessee REALTORS® MLS
Property Description
Location
State TN
County Knox County - 1
Area 8.76
Rooms
Other Rooms LaundryUtility, DenStudy, 2nd Rec Room, Extra Storage, Office, Breakfast Room, Great Room, Mstr Bedroom Main Level, Split Bedroom
Basement Crawl Space
Dining Room Eat-in Kitchen, Formal Dining Area, Breakfast Room
Interior
Interior Features Walk-In Closet(s), Pantry, Eat-in Kitchen
Heating Central, Heat Pump, Electric
Cooling Central Cooling, Ceiling Fan(s)
Flooring Carpet, Hardwood, Tile
Fireplaces Number 1
Fireplaces Type See-Thru, Wood Burning
Fireplace Yes
Window Features Windows - Bay
Appliance Dishwasher, Disposal, Microwave, Self Cleaning Oven
Heat Source Central, Heat Pump, Electric
Laundry true
Exterior
Exterior Feature Windows - Bay, Porch - Covered, Porch - Screened, Patio
Parking Features Off-Street Parking, Garage Door Opener, Attached, Main Level
Garage Spaces 2.0
Garage Description Attached, SideRear Entry, Garage Door Opener, Main Level, Off-Street Parking, Attached
View Country Setting, Wooded
Porch true
Total Parking Spaces 2
Garage Yes
Building
Lot Description Private, Wooded, Level, Rolling Slope
Faces Directions from Washington Pike: Washington Pike off I-640, go North approximately 2 miles, turn left on Luttrell Rd. Property will be on the right. I-640 East to Broadway Exit, go North (Left) and stay right on to Tazewell Pk. continue 3.5 miles, turn right on Luttrell Rd. Property will be on the left.
Sewer Septic Tank
Water Public
Architectural Style Traditional
Structure Type Frame
Others
Restrictions No
Tax ID 049 07001
Security Features Smoke Detector
Energy Description Electric
7121 Regal Lane, Ste 215, Knoxville, TN, 37918, United States